Nice ArcMAP extension allowing for simultaneous comparison of points in Arc and Google Earth. Can be downloaded….search for something like: Arc2Google ArcMAP extension.
Monday, February 28, 2011
Saturday, February 26, 2011
Wednesday, February 23, 2011
Friday, February 18, 2011
Thursday, February 17, 2011
Wednesday, February 9, 2011
Monday, February 7, 2011
car full of gear for canopy licoring.
angelica and I heading out for the first load.
stacks of gear, including our climbing equipment and safety gear and hanging chair for long canopy sessions.
Ready to go!
Stack of climbing and LiCORing gear ready to go.
Angelica and Kai leading up georeferencing operations on the ground.
Collecting our 4th curve set!
Saturday, February 5, 2011
one failed but interesting approach to classifying images using hierarchical trees.
Multi image stacking that’s been driving me crazy these last weeks. Just completed the first mosaic, 2008, comprised of ~30 images, yes! Running a despeckling program in IDL, hope it looks good.
Here is an example of the core of the despeckler procedure:
I’ve been planning to optimize it to run without the use of for loops, however at the moment this is just not necessary given we only have 3 mosaics to run (but it would go from 30 minutes processing time to probably around 30 seconds!).
Wednesday, February 2, 2011
Tuesday, February 1, 2011
02/01/11
System for canopy LiCOR measurements. Allows for ground based assistants to lift the LiCOR into the canopy, then fine adjustments via the climber.
System now including the extension for the cuvette head. This version will be cleaned prior to starting measurements on Wed or Thur. I’ll post a photo of the final cleaned setup before we head out.
Thursday, January 27, 2011
01/27/11
Close up of fern fronds used for LiCOR 6400 analyses. These are scanned at 600 dpi and used for area calculation prior to drying and lab analysis.
Wednesday, January 26, 2011
Monday, January 24, 2011
Friday, January 14, 2011
01/13/2011
Removed the sensors for calibration. Putting them up again early next week.
Angelica carrying a full geo-referencing kit.
LiCOR 6400 on the back, essential gear on the front. Ready to go!
Set up in the woods.
Wednesday, January 12, 2011
01/10-12/2011–Mon-Wed
LiCORing in the rain. Good progress on understory curves. Fixed a mystery leak, hard to track down, but ultimately solved by tightening a few screws around the cuvette head. A matter of 0.8 ppm C02 variation…
Saturday, January 8, 2011
Friday, January 7, 2011
Friday 01/07/11
- Job/Post-doc applications.
- Bolivia analysis.
- Sensors up and running (took 3 days to set up).
- Prepping for LiCOR work starting tomorrow through late next week.
- Road delineation in the Peruvian, Bolivian and Brazilian Amazon.
Have identified nearly 5000 km of roads within our study area in the year 1986. This will also be conducted for 2000 and 2008.
Monday, December 20, 2010
Friday 12/17/2010
New upper elevation location install of microclimate sensors.
One tired pup heading home from a long day in the field.
Thursday, December 16, 2010
Thursday 12/16/2010
Success. The preliminary version of the image merging procedure is functional. This will allow for highly controlled stacking of SLC-OFF Landsat imagery (2003+).
Wednesday, December 15, 2010
Tuesday–12/15/2010
IDL programming with help from D. Fanning. He has a great website for IDL reference available at: http://www.dfanning.com/
Image pointers are a great way to define new variables within FOR loops. Crucial for reading in multiple Landsat images of varying ZYZ dimensions.
Monday, December 13, 2010
Monday 12/13/2010
heading out to take down our sensors with a bag full of climbing gear.
the most important knot you can learn for tree climbing. the anchor knot.
Finally up and getting to work.