Saturday, February 5, 2011

ScreenClip

one failed but interesting approach to classifying images using hierarchical trees.

ScreenClip2

Multi image stacking that’s been driving me crazy these last weeks. Just completed the first mosaic, 2008, comprised of ~30 images, yes! Running a despeckling program in IDL, hope it looks good.

Here is an example of the core of the despeckler procedure:

ScreenClip3

I’ve been planning to optimize it to run without the use of for loops, however at the moment this is just not necessary given we only have 3 mosaics to run (but it would go from 30 minutes processing time to probably around 30 seconds!).

Wednesday, February 2, 2011

IMG_1205

Sensors and climbing gear ready to load into the truck. Leaf dryer in LL corner.

image

Full climbing setup for LiCOR 6400 canopy work up to 100 ft. Sweet! The climbing gear for climber is a stored in a separate larger backpack.

Tuesday, February 1, 2011

02/01/11

IMG_1198

System for canopy LiCOR measurements. Allows for ground based assistants to lift the LiCOR into the canopy, then fine adjustments via the climber.

 

IMG_1199

System now including the extension for the cuvette head. This version will be cleaned prior to starting measurements on Wed or Thur. I’ll post a photo of the final cleaned setup before we head out.

Thursday, January 27, 2011

01/27/11

56 012611

Close up of fern fronds used for LiCOR 6400 analyses. These are scanned at 600 dpi and used for area calculation prior to drying and lab analysis.

Wednesday, January 26, 2011

Monday, January 24, 2011

Week of Jan 24th 2011

IMG_1121

Rapid progress on understory LiCOR curve sets.

IMG_1123

Friday, January 14, 2011

01/13/2011

Removed the sensors for calibration. Putting them up again early next week.

image

Angelica carrying a full geo-referencing kit.

image

LiCOR 6400 on the back, essential gear on the front. Ready to go!

image

Set up in the woods.

Wednesday, January 12, 2011

01/10-12/2011–Mon-Wed

LiCORing in the rain. Good progress on understory curves. Fixed a mystery leak, hard to track down, but ultimately solved by tightening a few screws around the cuvette head. A matter of 0.8 ppm C02 variation…

Saturday, January 8, 2011

Friday, January 7, 2011

Friday 01/07/11

  • Job/Post-doc applications.
  • Bolivia analysis.
  • Sensors up and running (took 3 days to set up).
  • Prepping for LiCOR work starting tomorrow through late next week.
  • Road delineation in the Peruvian, Bolivian and Brazilian Amazon.

ScreenClip

Have identified nearly 5000 km of roads within our study area in the year 1986. This will also be conducted for 2000 and 2008.

Monday, December 20, 2010

Friday 12/17/2010

image

New upper elevation location install of microclimate sensors.

image

image

One tired pup heading home from a long day in the field.

Thursday, December 16, 2010

Thursday 12/16/2010

 

image

 

Success. The preliminary version of the image merging procedure is functional. This will allow for highly controlled stacking of SLC-OFF Landsat imagery (2003+).

Wednesday, December 15, 2010

Tuesday–12/15/2010

IDL programming with help from D. Fanning. He has a great website for IDL reference available at: http://www.dfanning.com/

66e66708-946b-4718-b63b-748ed2ac3ed3

Image pointers are a great way to define new variables within FOR loops. Crucial for reading in multiple Landsat images of varying ZYZ dimensions.

Monday, December 13, 2010

Tuesday–12/14/2010

Sweet! Made the cover!

image

Monday 12/13/2010

image

heading out to take down our sensors with a bag full of climbing gear.

image

the most important knot you can learn for tree climbing. the anchor knot.

image

Finally up and getting to work.

Friday, December 3, 2010

Friday 12/03/2010

 

IMG_0581

Drying desiccant. We’ve managed to convert most of our house into lab space!

Wednesday, December 1, 2010

Monday-Wednesday–12/01/10

  • Job applications
  • Bolivia article: introduction, research questions, methods, statistical analyses.

Monday, November 29, 2010

Friday–11/26/2010

Collecting LiCOR 6400 in the rain in the Laupahoehoe Experimental Forest.

Sunday, November 21, 2010

Sat-Sun: 11/21/10

  • Completing reviews for Bio. Cons., For Eco., and JAG.
  • Organized LiCOR 6400 data, verified curves, leaf drying.
  • Rebuilt LiCOR 6400, new tubes, seals and chemicals.
  • Finished Scan Line Corrections for Amazon land cover change project (70+ Landsat images).
  • Job applications: organization and preparation.

88d905db-c774-429b-8639-cdd569e49876

Example linear correlations between SIB2 Modeled and field collected Net Carbon Assimilation Rates. This includes data from both the light and C02 response curves.

9d7ac5ce-2903-4f16-b891-42d649bf8a1a

A dynamic light response over a 3 minute period following a replicated sunfleck (1500 ppm transition from steady state at 20 ppm).

Saturday, November 20, 2010

Friday 11/19/10

 

IMG_0466

car parked at one of our study sites

IMG_0468

setup pre rain

IMG_0476

setup post rain

IMG_0481

home again, changing the filters for the c02 cartridges, the only good use for cigarettes, cheap filters…

Thursday, November 18, 2010

Wednesday–11/18/10

IMG_0457

Job applications, curve collection.

IMG_0460

Improved LiCOR 6400 handle, reduces stress on attachment screws and allows for clipping a carabineer when collecting canopy measurements.

IMG_0461

Second tripod used to collect location offsets from the differentially corrected stake. This particular offset allowed for curve collection in a forest gap 35 meters from the stake.

Tuesday, November 16, 2010

11/16/10–Tuesday

  • Completed a job application.
  • All Landsat images AutoMCU processed.
  • Field work complete for the day, sensors up and running.

Interior forest sensors up and running

Sunday, November 14, 2010

Sat-Sunday: 11/13-14/10

Field work setting up microclimate stations

Job applications

image

IMG_0435

IMG_0438

Hidden up there are two microclimate stations we spent 3 hours tree climbing to set up. Beautiful!

Friday, November 12, 2010

Thursday-Friday: 11/11-12/10

Thursday collecting LiCOR curves.

IMG_0405

Notice abundant invasive species, including ginger, raspberry and guava, all within one small gap within one of the better native forests around. bummer!

IMG_0420

At home the leaves are scanned at 600 dpi for area measurement.

IMG_0422

Then oven dried at 55-65 C for 48 hours. Following this the samples are stored with desiccant until they are weighed, then analyzed for isotopes and nutrients.

Wednesday, November 10, 2010

Monday/Tuesday–11/10/10

  1. LiCOR data collection
  2. Checking on microclimate stations
  3. Programming IDL procedure for writing large images (8-20 GB)
  4. Job applications
image

An understory microclimate station with LiCOR 6400 collecting a C02 response curve in the background.

image

The Trupulse 3D laser system with LiCOR 6400 taking curve measurements in background.

image

My field assistant, Kai Turbo, taking a break.

Wednesday–11/10/10

  • Article review
  • Submitted job application
  • Fixed computer issue resulting in frequent crashing
  • Rebuilt LiCOR 6400, had leaks at tube seals and throughout the cuvette head. Ran full diagnostics. Runs perfect now! However, the tubes are a bit short so will look into ordering a replacement set.

image