Close up of fern fronds used for LiCOR 6400 analyses. These are scanned at 600 dpi and used for area calculation prior to drying and lab analysis.
Thursday, January 27, 2011
Wednesday, January 26, 2011
Monday, January 24, 2011
Friday, January 14, 2011
01/13/2011
Removed the sensors for calibration. Putting them up again early next week.
Angelica carrying a full geo-referencing kit.
LiCOR 6400 on the back, essential gear on the front. Ready to go!
Set up in the woods.
Wednesday, January 12, 2011
01/10-12/2011–Mon-Wed
LiCORing in the rain. Good progress on understory curves. Fixed a mystery leak, hard to track down, but ultimately solved by tightening a few screws around the cuvette head. A matter of 0.8 ppm C02 variation…
Saturday, January 8, 2011
Friday, January 7, 2011
Friday 01/07/11
- Job/Post-doc applications.
- Bolivia analysis.
- Sensors up and running (took 3 days to set up).
- Prepping for LiCOR work starting tomorrow through late next week.
- Road delineation in the Peruvian, Bolivian and Brazilian Amazon.
Have identified nearly 5000 km of roads within our study area in the year 1986. This will also be conducted for 2000 and 2008.
Monday, December 20, 2010
Friday 12/17/2010
New upper elevation location install of microclimate sensors.
One tired pup heading home from a long day in the field.
Thursday, December 16, 2010
Thursday 12/16/2010
Success. The preliminary version of the image merging procedure is functional. This will allow for highly controlled stacking of SLC-OFF Landsat imagery (2003+).
Wednesday, December 15, 2010
Tuesday–12/15/2010
IDL programming with help from D. Fanning. He has a great website for IDL reference available at: http://www.dfanning.com/
Image pointers are a great way to define new variables within FOR loops. Crucial for reading in multiple Landsat images of varying ZYZ dimensions.
Monday, December 13, 2010
Monday 12/13/2010
heading out to take down our sensors with a bag full of climbing gear.
the most important knot you can learn for tree climbing. the anchor knot.
Finally up and getting to work.
Friday, December 3, 2010
Wednesday, December 1, 2010
Monday-Wednesday–12/01/10
- Job applications
- Bolivia article: introduction, research questions, methods, statistical analyses.
Monday, November 29, 2010
Sunday, November 21, 2010
Sat-Sun: 11/21/10
- Completing reviews for Bio. Cons., For Eco., and JAG.
- Organized LiCOR 6400 data, verified curves, leaf drying.
- Rebuilt LiCOR 6400, new tubes, seals and chemicals.
- Finished Scan Line Corrections for Amazon land cover change project (70+ Landsat images).
- Job applications: organization and preparation.
Example linear correlations between SIB2 Modeled and field collected Net Carbon Assimilation Rates. This includes data from both the light and C02 response curves.
A dynamic light response over a 3 minute period following a replicated sunfleck (1500 ppm transition from steady state at 20 ppm).
Saturday, November 20, 2010
Friday 11/19/10
car parked at one of our study sites
setup pre rain
setup post rain
home again, changing the filters for the c02 cartridges, the only good use for cigarettes, cheap filters…
Thursday, November 18, 2010
Wednesday–11/18/10
Job applications, curve collection.
Improved LiCOR 6400 handle, reduces stress on attachment screws and allows for clipping a carabineer when collecting canopy measurements.
Second tripod used to collect location offsets from the differentially corrected stake. This particular offset allowed for curve collection in a forest gap 35 meters from the stake.
Tuesday, November 16, 2010
11/16/10–Tuesday
- Completed a job application.
- All Landsat images AutoMCU processed.
- Field work complete for the day, sensors up and running.
Sunday, November 14, 2010
Sat-Sunday: 11/13-14/10
Field work setting up microclimate stations
Job applications
Hidden up there are two microclimate stations we spent 3 hours tree climbing to set up. Beautiful!
Friday, November 12, 2010
Thursday-Friday: 11/11-12/10
Thursday collecting LiCOR curves.
Notice abundant invasive species, including ginger, raspberry and guava, all within one small gap within one of the better native forests around. bummer!
At home the leaves are scanned at 600 dpi for area measurement.
Then oven dried at 55-65 C for 48 hours. Following this the samples are stored with desiccant until they are weighed, then analyzed for isotopes and nutrients.
Wednesday, November 10, 2010
Monday/Tuesday–11/10/10
- LiCOR data collection
- Checking on microclimate stations
- Programming IDL procedure for writing large images (8-20 GB)
- Job applications
An understory microclimate station with LiCOR 6400 collecting a C02 response curve in the background.
The Trupulse 3D laser system with LiCOR 6400 taking curve measurements in background.
My field assistant, Kai Turbo, taking a break.
Wednesday–11/10/10
- Article review
- Submitted job application
- Fixed computer issue resulting in frequent crashing
- Rebuilt LiCOR 6400, had leaks at tube seals and throughout the cuvette head. Ran full diagnostics. Runs perfect now! However, the tubes are a bit short so will look into ordering a replacement set.
Friday, November 5, 2010
Thursday–11/05/2010
- Repositioned microclimate stations
- Downloaded data and replaced desiccant in all datalogger cases
- IDL programming, I/O programs for large images
- Correcting SLC Landsat 7 Errors in newly processed Landsat imagery.
Sweet new tires, expensive but worth it for safety!
Upper elevation data download
Serious ginger invasion in our lower elevation traverse site, close to the climate tower. This will make for an interesting future project proposal.
Data download lower elevation top of canopy climate tower
Tuesday, November 2, 2010
Monday-Tuesday – 11/02/2010
Job applications sent (2).
New off road tires on car, it has been skidding in heavy rains, very dangerous for this windy rainy roads of Laupahoehoe!
Caught up on Scan Line Corrections of Landsat imagery for Amazon project.
Working on flowcharts for model using Visio, interesting flowcharting program.
Making 3D LAD map (a 22 GB image as floating point, yikes, needs to be converted to a byte array).
point could density from 0-0.5 m height
Thursday, October 28, 2010
Thursday–10/29/2010
Finally completed the image subset procedure. Sweet. This is the only way to deal with multiple 8 GB LiDAR images. The I/O is also rapid, good for running through spatio-temporal models.
mapping out the microclimate model flowchart, here is the version as is showing individual IDL components, most have been started, highlighted yellow ones have been completed.