Monday, February 28, 2011

ScreenClip

Nice ArcMAP extension allowing for simultaneous comparison of points in Arc and Google Earth. Can be downloaded….search for something like: Arc2Google ArcMAP extension.

Saturday, February 26, 2011

ScreenClip

Excellent! Making rapid progress on road mapping and validation!! Angelica has done amazing with the Quickbird imagery. Here is a small low resolution subset of our study area.

Wednesday, February 23, 2011

ScreenClip

Finally, the finished river/water mask for a small subset (low res version) around Puerto Maldonado (Peruvian Amazon) in our study area!

Friday, February 18, 2011

IMG_1390

IMG_1392

3 sites down, 17 to go!

Thursday, February 17, 2011

IMG_1385IMG_1372IMG_1373IMG_1375IMG_1379IMG_1382IMG_1384

Calibration and installation of our sensors. Unfortunately one of our PAR sensors shorted out, will have to send it back to Apogee and have it replaced when we take them down next week.

Wednesday, February 9, 2011

image

Soil gas efflux sampling for Kye (Stanford Post-doc) project linking remote sensing with soil C02 emissions. These samples will be analyzed on a GC (Gas Chromatograph) back at Stanford in the upcoming month.

image

IMG_1353

4 7 ml samples every 20 minutes for 4 cycles.

Monday, February 7, 2011

image

car full of gear for canopy licoring.

image

angelica and I heading out for the first load.

image

stacks of gear, including our climbing equipment and safety gear and hanging chair for long canopy sessions.

image

Ready to go!

image

Stack of climbing and LiCORing gear ready to go.

image

Angelica and Kai leading up georeferencing operations on the ground.

image

Collecting our 4th curve set!

Saturday, February 5, 2011

ScreenClip

one failed but interesting approach to classifying images using hierarchical trees.

ScreenClip2

Multi image stacking that’s been driving me crazy these last weeks. Just completed the first mosaic, 2008, comprised of ~30 images, yes! Running a despeckling program in IDL, hope it looks good.

Here is an example of the core of the despeckler procedure:

ScreenClip3

I’ve been planning to optimize it to run without the use of for loops, however at the moment this is just not necessary given we only have 3 mosaics to run (but it would go from 30 minutes processing time to probably around 30 seconds!).

Wednesday, February 2, 2011

IMG_1205

Sensors and climbing gear ready to load into the truck. Leaf dryer in LL corner.

image

Full climbing setup for LiCOR 6400 canopy work up to 100 ft. Sweet! The climbing gear for climber is a stored in a separate larger backpack.

Tuesday, February 1, 2011

02/01/11

IMG_1198

System for canopy LiCOR measurements. Allows for ground based assistants to lift the LiCOR into the canopy, then fine adjustments via the climber.

 

IMG_1199

System now including the extension for the cuvette head. This version will be cleaned prior to starting measurements on Wed or Thur. I’ll post a photo of the final cleaned setup before we head out.